Roundabout Construction Detour

Make each day an adventure and take the time to enjoy the journey.
— Unknown

Roundabout construction at the intersection of M89 and M40 will begin Monday, March 25, 2024, and is anticipated to be open to traffic at the end of August. The total project is anticipated to be finished in November.

Google Maps will help navigate you around the construction. This graphic also highlights our suggested localized detour routes to Allegan Event, depending on the direction you are traveling from.

 

FROM HOLLAND

  • Head southeast toward Allegan on M40

  • Turn left on Babylon Rd. and continue to 118th Ave.

  • Turn right on River St.

  • Turn right into the Allegan Event entrance

FROM Grand rapids

  • Head west toward Allegan on M222 and continue to Grand St.

  • Turn right on River St.

  • Turn left into the Allegan Event entrance

FROM Plainwell

  • Head west toward Allegan on M89

  • Turn right onto the 2nd St. Iron Bridge

  • Turn left on Water St.

  • Turn right on Grand St.

  • Turn left on River St.

  • Turn left into the Allegan Event entrance

FROM GOBLES/pAW PAW

  • Head north toward Allegan on M40

  • Turn left onto Thomas St.

  • Turn right on Ely St.

  • Turn left on Sunset

  • Turn right on Sherman

  • Turn right on Western Ave / Cutler St.

  • Turn left onto Pine St.

  • Turn right onto Monroe St and continue to Grand St.

  • Turn left onto River St.

  • Turn left into the Allegan Event entrance

 

See you soon!